View Single Post
Old 05-09-2019, 05:43 AM
  # 98 (permalink)  
STDragon
Sober-T- Dragon
 
STDragon's Avatar
 
Join Date: Oct 2016
Location: Manitoba
Posts: 8,762
Up at 7am.

Originally Posted by stargazer016 View Post
How are the renovations coming along Dragon? My bathroom needs a lot of work, to the point where I might have to pay someone to tear it down to the studs and rebuild it at some point down the line.

Have a good day all!
That's close to what I did. I didn't cut out all the plaster walls but quite a bit was removed. Our bathroom was in embarassing shape. Took out maybe a third of the walls, scraped off the wall paper, took out the vanity and toilet and flooring right down to the subfloor. I Installed an LED light in the tub (no more showering in the dark). refinished the walls and ceiling then got 4 coats of eggshell white on and new plywood down on the floor. All that took me ten days. Today I start glueing down new floor tiles. I hope to have the toilet back in before Mrs Dragons return from holiday. Then we'll work on the final details together (new vanity / cabinets / base boards ect...)
STDragon is offline